Loading…
Back To Schedule
Wednesday, September 14 • 10:30am - 11:15am
Fire Hydrant Operation, Maintenance, and Repair

Sign up or log in to save this to your schedule, view media, leave feedback and see who's attending!



Presentation will cover proper operation of fire hydrants. We will also look at the internal parts of a fire hydrant (from operating nut to main seating valve). Also covered will be procedures to follow for annual fire hydrant inspections, and detailed information about properly installing fire hydrant extensions. Lastly, since every hydrant is mated with a 6” gate valve (for isolation of the hydrant), we will also look at the difference between C509 Gate Valves and C515 Gate Valves


Wednesday September 14, 2016 10:30am - 11:15am MDT
Sunbrook A

Attendees (3)