Upgrades to the QCWTP from 40 to 60 MGD for less than $2.5 Million.
- Lab Remodel
- 5 MG WaterStorage Reservoir concrete corrosion challenges.
- 9 MG Water Storage Reservoir steel tank corrosion challenges.
- Well corrosion and mitigation efforts and experiments.
- Irrigation Impoundment failure and needed repairs.
- West Dam Springs modifications and resulting Manganese problems.
- Hydro Electric Power Plant upgrades.
- Solar Powered Wells in isolated unincorporated areas.
- HDPE oxidation related pipe failure and its cost.